Die Eike
Southern Africa
Overview
Phase 1 A Commercial Fruit Farm in the Witzenberg Valley, Die Eike needed to supplement their energy requirement due to limited availability in the region. In phase 1 we provided them a 702KWp Solar PV plant with reticulation.
Phase 2 As a part of the greater proposal to extend the grid-tied PV solar energy system already installed, an expanded plant was proposed for Die Eike farm. The soler systems voltage was stepped up to medium voltage (MV). The same size as phase 1, phase 2 is located on the east side of the farm. Further, phase 2 has the same orientation.
Type:
Grid Tied
Mount:
Ground
Size:
1409 kWp (phase 1= 702 kWp Phase 2= 707 kWp
Renewable %:
23%